Solomon R. Guggenheim Museum
Contents |
[edit] Introduction
The Solomon R. Guggenheim Museum is an art museum located on Fifth Avenue in the Upper East Side neighborhood of Manhattan, New York City. Designed as a distinctive cylindrical form by the architect Frank Lloyd Wright, it is widely acknowledged to be a landmark example of the International Style.
Originally known as the Museum of Non-Objective Painting, the museum was first established by the Solomon R. Guggenheim Foundation in 1939, but in a different location. In the late-1940s, plans were made to move, and Frank Lloyd Wright was commissioned to design a new ‘temple of the spirit’.
It was the only museum Wright designed and would prove to be his final project, as he died six months before its official opening in October 1959. It provoked a mixed response, with some critics calling it ‘the most beautiful building in America’, while others believed the architecture detracted from the art itself, calling it ‘less a museum than a monument to Wright’.
It is now a popular tourist attraction, with around 1.3 million visitors a year.
[edit] Design and construction
Wright was not particularly keen on the idea of designing a building for the ‘overbuilt and overpopulated’ Manhattan. However, after considering several locations he chose the Fifth Avenue site because of its close proximity to Central Park. The urban location meant Wright had to design the building vertically rather than horizontally, in a form that was a departure from the rural works with which he was associated.
He settled on a cylindrical form, with a wider top than base, and the appearance of a white ribbon curled into a stack, in stark contrast to the typically-rectangular buildings that characterised Manhattan.
Wright’s design dispensed with the conventional approach to museum layout. He conceived a continuous helical ramp on a gentle slope that spirals around the outer edges of the building. This allows visitors to view the 92 m-high atrium that rises to an expansive glass dome, while passing several bays of artwork on different levels, creating ‘one great space on a continuous floor’.
In terms of function, a number of artists raised doubts about his design. The shape of the interior walls meant paintings had to be tilted backward, and there were difficulties hanging linear artworks on concave surfaces.
The construction of the building was delayed by World War II, during which, the cost of building materials rose. Construction actually began in 1956 and was completed in 1959.
[edit] Subsequent construction
The museum has been changed a number of times since its completion. There was a major expansion and renovation in 1990-92, when Wright’s original plan for an adjoining sandstone tower was realised. In addition, the atrium skylight, which had been covered, was restored to its original design.
Between 2005 and 2008, the museum underwent exterior restoration to repair cracks and modernise climate-control systems.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.





















